Frontpage

  • Opening of the HRMT-45 module by means of a robot

    BROKEN CDS VIDEO IFRAME NOT MOVED (drupal url : https://cem-mro.web.cern.ch//node/557) Opening of the HRMT-45 module by means of a robot in bldg 867-R-P58. After having undergone several high intensity beam impacts at the HiRadMat facility in August, the TDIS HRMT-45 module starts to be disassembled by the EN/STI-TCD and EN/SMM-MRO teams in the bunker 867-R-P58…

  • CHARM facility: successful operation restarting

    CHARM facility: successful operation restarting

    At the end of the T8 line in the EAST Area, a one-of-a-kind test facility can be found. It is called CHARM, a radiation test facility dedicated to testing of electronics and systems in well characterized mixed radiation fields. The facility can replicate a wide number of radiation environments of an accelerator complex, for example…

  • The HiRadMat MULTIMAT 2 test stand

    The HiRadMat MULTIMAT 2 test stand

    In the end of September 2021 the HiRadMat experiment 57 took place. After meticulous planning and preparation, the MULTIMAT 2 experiment was installed in HiRadMat (High Irradiation to Materials), and now it is ready for an intense week of material testing. Thanks to the efforts of BE-CEM, SY-STI and EN-MME, both the test and data…